The paper presents the methodology for determining the most favorable method for buffer sizing in the Critical Chain Method (CCM), which is based on multi-criteria decision-making methods. The proposed methodology enables a complete and systematic solution to this problem, whose end result is a proposal for a buffer sizing method in accordance with the adopted criteria and realistic limitations. The developed methodology is based on the PROMETHEE method, and its verification was carried out on a case study of the construction of a residential building. The results showed that the CCM-RSEM method is the most effective for planning and project management in construction.
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.