This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
,
Faculty of Civil Engineering and Architecture, University of Nis , Niš , Serbia
,
Faculty of Civil Engineering and Architecture, University of Nis , Niš , Serbia
Beohidro doo , Belgrade , Serbia
This paper presents an integrated hydraulic, energy and economic analysis of two diversion-system alternatives for the small hydropower plant “Merćez” on the Lukovska River. Two technical concepts are considered: Alternative I – water conveyance through a pressurized steel pipeline, and Alternative II – an open-channel diversion system with a forebay tank. The comparison is based on hydraulic losses, operating head, installed capacity, annual electricity production and investment requirements. The open-channel diversion option yields better energy metrics but demands higher investment. The economic analysis is restricted to comparative cost metrics.
small hydropower plant, diversion system, hydraulic design;, installed capacity, economic analysis
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.