Home Archive News Contact
PDF download
Cite article
Share options
Informations, rights and permissions
Issue image
Vol 15, Issue 1, 2022
Pages: 0 - 0
Review paper
Architecture
See full issue

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. 

Metrics and citations
Abstract views: 154
PDF Downloads: 77
Google scholar: See link
Article content
  1. Abstract
  2. Disclaimer
Published: 01.12.2021. Review paper Architecture

GEODETIC WORKS ON THE CONSTRUCTION OF THE MRKE TUNNEL IN THE CONTEXT OF METHOD OF EXECUTION OF WORKS AND GEOMORPHOLOGICAL CONDITIONS

By
Radovan Đurović ,
Radovan Đurović
Ivan Mrdak ,
Ivan Mrdak
Gojko Nikolić ,
Gojko Nikolić
Zoran Sušić ,
Zoran Sušić
Marko Marković
Marko Marković
Abstract

In this paper geodetic works during the excavation of tunnels are presented, with specific example of Mrke Tunnel on the highway section Smokovac -Mateševo in Montenegro. All phases of geodetic works have been presented, such as the construction of underground and overground geodetic networks, control of tunnel excavation process, as well as geodetic works on the monitoring of radial deformations during the excavation. The New Austrian Tunnel Method (NATM) has been implemented for the excavation of the Mrke Tunnel, therefore the concept of active geotechnical design was presented and the review of specific geodetic works on surveying and monitoring with reference to its application was provided. The geomorphological conditions of the surveyed structure have also been presented.

The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.