The Ibarac tunnel was excavated as part of the Rožaje bypass project in Montenegro. Nearly half of the excavation was carried out in glaciofluvial sediments consisting of brown sandy clay with gravel and rock fragments. As the original design did not anticipate tunneling through such deposits, the subsequent adoption of overly optimistic geotechnic...

By Nikola Čađenović, Ivan Maretić

After the catastrophic 1979 earthquake, a classification according to the degree of damage was carried out on about 40,000 buildings in the area of six municipalities along the coast of Montenegro. The results showed that a significant number of commercial, residential and hotel buildings were destroyed or heavily damaged as a result of liquefactio...

By Nikola Čađenović